1794.60—Normal sequence.
               		
               	 	
               	 	
               	 	               	 	               	 	               	 	               	 	
               	 	
    
         For proposed actions requiring an EIS (see  § 1794.25 ), the NEPA process shall proceed in the same manner as for proposed actions requiring an EA with scoping through the point at which the scoping process is completed (see  § 1794.52 ).