Compliance Dates—Inspections and Test Under § 180.407(C)
| External Visual Inspection: |
| All cargo tanks designed to be loaded by vacuum with full opening rear heads |
September 1, 1991 |
6 months. |
| All other cargo tanks |
September 1, 1991 |
1 year. |
| Internal Visual Inspection: |
| All insulated cargo tanks, except MC 330, MC 331, MC 338 (see Note 4) |
September 1, 1991 |
1 year. |
| All cargo tanks transporting lading corrosive to the tank |
September 1, 1991 |
1 year. |
| All other cargo tanks, except MC 338 |
September 1, 1995 |
5 years. |
| Lining Inspection: |
| All lined cargo tanks transporting lading corrosive to the tank |
September 1, 1991 |
1 year. |
| Leakage Test: |
| MC 330 and MC 331 cargo tanks in chlorine service |
September 1, 1991 |
2 years. |
| All other cargo tanks except MC 338 |
September 1, 1991 |
1 year. |
| Pressure Test: |
| (Hydrostatic or pneumatic) (See Notes 2 and 3) |
|
|
| All cargo tanks which are insulated with no manhole or insulated and lined, except MC 338 |
September 1, 1991 |
1 year. |
| All cargo tanks designed to be loaded by vacuum with full opening rear heads |
September 1, 1992 |
2 years. |
| MC 330 and MC 331 cargo tanks in chlorine service |
September 1, 1992 |
2 years. |
| All other cargo tanks |
September 1, 1995 |
5 years. |
| Thickness Test: |
| All unlined cargo tanks transporting material corrosive to the tank, except MC 338 |
September 1, 1992 |
2 years. |
|
Note 1: If a cargo tank is subject to an applicable inspection or test requirement under the regulations in effect on December 30, 1990, and the due date (as specified by a requirement in effect on December 30, 1990) for completing the required inspection or test occurs before the compliance date listed in table I, the earlier date applies. |
|
Note 2: Pressure testing is not required for MC 330 and MC 331 cargo tanks in dedicated sodium metal service. |
|
Note 3: Pressure testing is not required for uninsulated lined cargo tanks, with a design pressure or MAWP 15 psig or less, which receive an external visual inspection and lining inspection at least once each year. |
|
Note 4: Insulated cargo tanks equipped with manholes or inspection openings may perform either an internal visual inspection in conjunction with the external visual inspection or a hydrostatic or pneumatic pressure-test of the cargo tank. |