Find Laws Find Lawyers Free Legal Forms USA State Laws

CFR

22.946—Service commencement and construction systems.

(a) Commencement of service. New cellular systems must be at least partially constructed and begin providing cellular service to subscribers within the service commencement periods specified in Table H-1 of this section. Service commencement periods begin on the date of grant of the initial authorization, and are not extended by the grant of subsequent authorizations for the cellular system (such as for major modifications). The licensee must notify the FCC (FCC Form 601) after the requirements of this section are met (see § 1.946 of this chapter ).
Table H-1—Commencement of Service
Type of cellular system Required to commence service in
The first system authorized on each channel block in markets 1-90 36 months.
The first system authorized on each channel block in all other markets and any subsequent systems authorized pursuant to contracts in partitioned markets 18 months.
The first system authorized on each channel block in the Gulf of Mexico Exclusive Zone No requirement.
All other systems 12 months.
(b) To satisfy this requirement, a cellular system must be interconnected with the public switched telephone network (PSTN) and must be providing service to mobile stations operated by its subscribers and roamers. A cellular system is considered to be providing service only if mobile stations can originate telephone calls to and receive telephone calls from wireline telephones through the PSTN.
(c) Construction period for specific facilities. The construction period applicable to specific new or modified cellular facilities for which a separate authorization is granted is one year, beginning on the date the authorization is granted.
[67 FR 9609, Mar. 4, 2002, as amended at 67 FR 77192, Dec. 17, 2002]
Tips