Prior to loading any solid hazardous material in bulk on board a vessel:
(a)
Each hold must be thoroughly cleaned of all loose debris and dunnage; but permanent wooden battens or sheathing may remain in the hold; and
(b)
Each hold and each bilge of that hold must be dry.