Allowable costs for preparing a mobile home for shipment include but are not limited to:
(a)
Blocking and unblocking (including anchoring and unanchoring);
(b)
Labor costs of removing and installing skirting;
(c)
Separating, preparing, and sealing each section for movement;
(d)
Reassembling the two halves of a double-wide mobile home;
(f)
Rental, installation, removal and transportation of hitches and extra axles with wheels and tires;
(g)
Purchasing blocks in lieu of transporting blocks from old official station and cost of replacement blocks broken while mobile home was being transported;
(h)
Packing and unpacking of HHG associated with the mobile home;
(i)
Disconnecting and connecting utilities;
(j)
Installation and removal of towing lights on trailer;
(k)
Charges for reasonable extension of existing water and sewer lines; and
(l)
Dismantling and assembling a portable room appended to a mobile home.