The Administrator, GSA, will ascertain the possibilities of economies to be derived through the establishment of a fleet management system in a specific geographical area. After preliminary investigation, he or she will notify the head of each agency concerned at least 30 calendar days in advance of the intent to conduct a study to develop data and justification as to the feasibility of establishing a fleet management system. The notification, in writing, will include:
(a)
The approximate geographical area to be included in the study, including a defined mandatory use service area and an optional use service area; and
(b)
The date on which the study will begin.
Code of Federal Regulations
[51 FR 11023, Apr. 1, 1986, as amended at 56 FR 59887, Nov. 26, 1991]