Table 1—Conformity Criteria
All Actions at all times: |
§ 93.110
|
Latest planning assumptions |
§ 93.111
|
Latest emissions model |
§ 93.112
|
Consultation |
Transportation Plan: |
§ 93.113(b)
|
TCMs |
§ 93.118
or § 93.119
|
Emissions budget and/or Interim emissions |
TIP: |
§ 93.113(c)
|
TCMs |
§ 93.118
or § 93.119
|
Emissions budget and/or Interim emissions |
Project (From a Conforming Plan and TIP): |
§ 93.114
|
Currently conforming plan and TIP |
§ 93.115
|
Project from a conforming plan and TIP |
§ 93.116
|
CO, PM10, and PM2.5 hot-spots. |
§ 93.117
|
PM10 and PM2.5 control measures |
Project (Not From a Conforming Plan and TIP): |
§ 93.113(d)
|
TCMs |
§ 93.114
|
Currently conforming plan and TIP |
§ 93.116
|
CO, PM10, and PM2.5 hot-spots. |
§ 93.117
|
PM10 and PM2.5 control measures |
§ 93.118
and/or § 93.119
|
Emissions budget and/or Interim emissions |