Table 1—Conformity Criteria
| All Actions at all times: |
|
§ 93.110
|
Latest planning assumptions |
|
§ 93.111
|
Latest emissions model |
|
§ 93.112
|
Consultation |
| Transportation Plan: |
|
§ 93.113(b)
|
TCMs |
|
§ 93.118
or § 93.119
|
Emissions budget and/or Interim emissions |
| TIP: |
|
§ 93.113(c)
|
TCMs |
|
§ 93.118
or § 93.119
|
Emissions budget and/or Interim emissions |
| Project (From a Conforming Plan and TIP): |
|
§ 93.114
|
Currently conforming plan and TIP |
|
§ 93.115
|
Project from a conforming plan and TIP |
|
§ 93.116
|
CO, PM10, and PM2.5 hot-spots. |
|
§ 93.117
|
PM10 and PM2.5 control measures |
| Project (Not From a Conforming Plan and TIP): |
|
§ 93.113(d)
|
TCMs |
|
§ 93.114
|
Currently conforming plan and TIP |
|
§ 93.116
|
CO, PM10, and PM2.5 hot-spots. |
|
§ 93.117
|
PM10 and PM2.5 control measures |
|
§ 93.118
and/or § 93.119
|
Emissions budget and/or Interim emissions |