The draw of the S82 bridge, mile 6.3, in Cameron Parish shall open on signal if at least 8 hours notice is given. Public vessels of the United States and vessels in distress shall be passed as soon as possible.
Code of Federal Regulations
[CGD08-94-029, 60 FR 4561, Jan. 24, 1995]