(a)
The applicant shall provide adequate soil survey information on those portions of the permit area to be affected by surface operations or facilities consisting of the following:
(1)
A map delineating different soils;
(3)
Soil description; and
(4)
Present and potential productivity of existing soils.
(b)
Where the applicant proposes to use selected overburden materials as a supplement or substitute for topsoil, the application shall provide results of the analyses, trials and tests required under 30 CFR 817.22.
Code of Federal Regulations
Editorial Note:
For a document suspending § 783.21
in part, see 45 FR 51548, Aug. 4, 1980.