Material | Full thickness undressed lumber | Nominal thickness lumber | ||||||
---|---|---|---|---|---|---|---|---|
Working load (p.s.f.) | 25 | 50 | 75 | 25 | 50 | |||
Permissible span (ft.) | 10 | 8 | 6 | 8 | 9 |
Maximum height of scaffold | ||
---|---|---|
20 feet | 60 feet | |
Uniformly distributed load | Not to exceed 25 pounds per square foot. | |
Poles or uprights | 2 by 4 in | 4 by 4 in. |
Pole spacing (longitudinal) | 6 ft. 0 in | 10 ft. 0 in. |
Maximum width of scaffold | 5 ft. 0 in | 5 ft. 0 in. |
Bearers or putlogs to 3 ft. 0 in. width | 2 by 4 in | 2 by 4 in. |
Bearers or putlogs to 5 ft. 0 in. width | 2 by 6 in. or 3 by 4 in | 2 by 6 in. or 3 by 4 in.(rough). |
Ledgers | 1 by 4 in | 11/4 by 9 in. |
Planking | 11/4 by 9 in. (rough) | 2 by 9 in. |
Vertical spacing of horizontal members | 7 ft. 0 in | 7 ft. 0 in. |
Bracing, horizontal and diagonal | 1 by 4 in | 1 by 4 in. |
Tie-ins | 1 by 4 in | 1 by 4 in. |
Toeboards | 4 in. high (minimum) | 4 in. high (minimum). |
Guardrail | 2 by 4 in | 2 by 4 in. |
Code of Federal Regulations
135
|
||
All members except planking are used on edge. |
Uniformly distributed load | Not to exceed 50 pounds per square foot. |
Maximum height of scaffold | 60 ft. |
Poles or uprights | 4 by 4 in. |
Pole spacing (longitudinal) | 8 ft. 0 in. |
Maximum width of scaffold | 5 ft. 0 in. |
Bearers or putlogs | 2 by 9 in. or 3 by 4 in. |
Spacing of bearers or putlogs | 8 ft. 0 in. |
Ledgers | 2 by 9 in. |
Vertical spacing of horizontal members | 9 ft. 0 in. |
Bracing, horizontal | 1 by 6 in. or 11/4 by 4 in. |
Bracing, diagonal | 1 by 4 in. |
Tie-ins | 1 by 4 in. |
Planking | 2 by 9 in. |
Toeboards | 4 in. high (minimum). |
Guardrail | 2 by 4 in. |
All members except planking are used on edge. |
Uniformly distributed load | Not to exceed 75 pounds per square foot. |
Maximum height of scaffold | 60 ft. |
Poles or uprights | 4 by 4 in. |
Pole spacing (longitudinal) | 6 ft. 0 in. |
Maximum width of scaffold | 5 ft. 0 in. |
Bearers or putlogs | 2 by 9 in. or 3 by 5 in. (rough). |
Spacing of bearers or putlogs | 6 ft. 0 in. |
Ledgers | 2 by 9 in. |
Vertical spacing of horizontal members | 6 ft. 6 in. |
Bracing, horizontal and diagonal | 2 by 4 in. |
Tie-ins | 1 by 4 in. |
Planking | 2 by 9 in. |
Toeboards | 4 in. high (minimum). |
Guardrail | 2 by 4 in. |
All members except planking are used on edge. |
Maximum height of scaffold | ||
---|---|---|
20 feet | 60 feet | |
Uniformly distributed load | Not to exceed 25 pounds per square foot. | |
Poles or uprights | 2 by 4 in | 4 by 4 in. |
Pole spacing (longitudinal) | 6 ft. 0 in | 10 ft. 0 in. |
Pole spacing (transverse) | 6 ft. 0 in | 10 ft. 0 in. |
Ledgers | 11/4 by 4 in | 11/4 by 9 in. |
Bearers to 3 ft. 0 in. span | 2 by 4 in | 2 by 4 in. |
Bearers to 10 ft. 0 in. span | 2 by 6 in. or 3 by 4 in | 2 by 9 (rough) or 3 by 8 in. |
Planking | 11/4 by 9 in | 2 by 9 in. |
Vertical spacing of horizontal members | 7 ft. 0 in | 7 ft. 0 in. |
Bracing, horizontal and diagonal | 1 by 4 in | 1 by 4 in. |
Tie-ins | 1 by 4 in | 1 by 4 in. |
Toeboards | 4 in. high | 4 in. high (minimum). |
Guardrail | 2 by 4 in | 2 by 4 in. |
All members except planking are used on edge. |
Uniformly distributed load | Not to exceed 50 pounds per square foot. |
Maximum height of scaffold | 60 ft. |
Poles or uprights | 4 by 4 in. |
Pole spacing (longitudinal) | 8 ft. 0 in. |
Pole spacing (transverse) | 8 ft. 0 in. |
Ledgers | 2 by 9 in. |
Vertical spacing of horizontal members | 6 ft. 0 in. |
Spacing of bearers | 8 ft. 0 in. |
Bearers | 2 by 9 in. (rough) or 2 by 10 in. |
Bracing, horizontal | 1 by 6 in. or 11/4 by 4 in. |
Bracing, diagonal | 1 by 4 in. |
Tie-ins | 1 by 4 in. |
Planking | 2 by 9 in. |
Toeboards | 4 in. high (minimum). |
Guardrail | 2 by 4 in. |
All members except planking are used on edge. |
Uniformly distributed load | Not to exceed 75 pounds per square foot. |
Maximum height of scaffold | 60 ft. |
Poles or uprights | 4 by 4 in. |
Pole spacing (longitudinal) | 6 ft. 0 in. |
Pole spacing (transverse) | 8 ft. 0 in. |
Ledgers | 2 by 9 in. |
Vertical spacing of horizontal members | 4 ft. 6 in. |
Bearers | 2 by 9 in. (rough). |
Bracing, horizontal and diagonal | 2 by 4 in. |
Tie-ins | 1 by 4 in. |
Planking | 2 by 9 in. |
Toeboards | 4 in. high (minimum). |
Guardrail | 2 by 4 in. |
All members except planking are used on edge. |
Uniformly distributed load | Not to exceed 25 p.s.f. |
post spacing (longitudinal) | 10 ft. 0 in. |
Post spacing (transverse) | 6 ft. 0 in. |
Working levels | Additional planked levels | Maximum height |
---|---|---|
1 | 8 | 125 ft. |
2 | 4 | 125 ft. |
3 | 0 | 91 ft. 0 in. |
Uniformly distributed load | Not to exceed 50 p.s.f. |
Post spacing (longitudinal) | 8 ft. 0 in. |
Post spacing (transverse) | 6 ft. 0 in. |
Working levels | Additional planked levels | Maximum height |
---|---|---|
1 | 6 | 125 ft. |
2 | 0 | 78 ft. 0 in. |
Uniformly distributed load | Not to exceed 75 p.s.f. |
Post spacing (longitudinal) | 6 ft. 6 in. |
Post spacing (transverse) | 6 ft. 0 in. |
Working levels | Additional planked levels | Maximum height |
---|---|---|
1 | 6 | 125 ft. |
Light duty | Medium duty | |
---|---|---|
Maximum scaffold load | 25 p.s.f. | 50 p.s.f. |
Outrigger size | 2×10 in | 3×10 in. |
Maximum outrigger spacing | 10 ft 0 in | 6 ft 0 in. |
Planking | 2×9 in | 2×9 in. |
Guardrail | 2×4 in | 2×4 in. |
Guardrail uprights | 2×4 in | 2×4 in. |
Toeboards (minimum) | 4 in | 4 in. |