Selection procedure | Criteria for using a selection procedure | Award criteria options |
---|---|---|
(a) Two-Phase Selection Procedures (RFQ followed by RFP) | § 636.202 | Lowest price, Adjusted low-bid (price per quality point), meets criteria/low bid, weighted criteria process, fixed price/best design, best value. |
(b) Single Phase (RFP) | Project not meeting the criteria in § 636.202 | All of the award criteria in item (a) of this table. |
(c) Modified Design-Build (may be one or two phases) | Any project | Lowest price technically acceptable. |