Factors considered in the evaluation of sites include those relating both to the proposed reactor design and the characteristics peculiar to the site. It is expected that reactors will reflect through their design, construction and operation an extremely low probability for accidents that could result in release of significant quantities of radioactive fission products. In addition, the site location and the engineered features included as safeguards against the hazardous consequences of an accident, should one occur, should insure a low risk of public exposure. In particular, the Commission will take the following factors into consideration in determining the acceptability of a site for a power or testing reactor:
(a) Characteristics of reactor design and proposed operation including:
(1) Intended use of the reactor including the proposed maximum power level and the nature and inventory of contained radioactive materials;
(2) The extent to which generally accepted engineering standards are applied to the design of the reactor;
(3) The extent to which the reactor incorporates unique or unusual features having a significant bearing on the probability or consequences of accidental release of radioactive materials;
(4) The safety features that are to be engineered into the facility and those barriers that must be breached as a result of an accident before a release of radioactive material to the environment can occur.
(b) Population density and use characteristics of the site environs, including the exclusion area, low population zone, and population center distance.
(c) Physical characteristics of the site, including seismology, meteorology, geology, and hydrology.
(1) Appendix A, “Seismic and Geologic Siting Criteria for Nuclear Power Plants,” describes the nature of investigations required to obtain the geologic and seismic data necessary to determine site suitability and to provide reasonable assurance that a nuclear power plant can be constructed and operated at a proposed site without undue risk to the health and safety of the public. It describes procedures for determining the quantitative vibratory ground motion design basis at a site due to earthquakes and describes information needed to determine whether and to what extent a nuclear power plant need be designed to withstand the effects of surface faulting.
(2) Meteorological conditions at the site and in the surrounding area should be considered.
(3) Geological and hydrological characteristics of the proposed site may have a bearing on the consequences of an escape of radioactive material from the facility. Special precautions should be planned if a reactor is to be located at a site where a significant quantity of radioactive effluent might accidentally flow into nearby streams or rivers or might find ready access to underground water tables.
(d) Where unfavorable physical characteristics of the site exist, the proposed site may nevertheless be found to be acceptable if the design of the facility includes appropriate and adequate compensating engineering safeguards.

Code of Federal Regulations

[27 FR 3509, Apr. 12, 1962, as amended at 38 FR 31281, Nov. 13, 1973]
(a) As an aid in evaluating a proposed site, an applicant should assume a fission produce release 1 from the core, the expected demonstrable leak rate from the containment and the meteorological conditions pertinent to his site to derive an exclusion area, a low population zone and population center distance. For the purpose of this analysis, which shall set forth the basis for the numerical values used, the applicant should determine the following:

Code of Federal Regulations


Footnote(s): 1 The fission product release assumed for these calculations should be based upon a major accident, hypothesized for purposes of site analysis or postulated from considerations of possible accidental events, that would result in potential hazards not exceeded by those from any accident considered credible. Such accidents have generally been assumed to result in substantial meltdown of the core with subsequent release of appreciable quantities of fission products.
(1) An exclusion area of such size that an individual located at any point on its boundary for two hours immediately following onset of the postulated fission product release would not receive a total radiation dose to the whole body in excess of 25 rem 2 or a total radiation dose in excess of 300 rem 2 to the thyroid from iodine exposure.

Code of Federal Regulations


Footnote(s): 2 The whole body dose of 25 rem referred to above corresponds numerically to the once in a lifetime accidental or emergency dose for radiation workers which, according to NCRP recommendations may be disregarded in the determination of their radiation exposure status (see NBS Handbook 69 dated June 5, 1959). However, neither its use nor that of the 300 rem value for thyroid exposure as set forth in these site criteria guides are intended to imply that these numbers constitute acceptable limits for emergency doses to the public under accident conditions. Rather, this 25 rem whole body value and the 300 rem thyroid value have been set forth in these guides as reference values, which can be used in the evaluation of reactor sites with respect to potential reactor accidents of exceedingly low probability of occurrence, and low risk of public exposure to radiation.
(2) A low population zone of such size that an individual located at any point on its outer boundary who is exposed to the radioactive cloud resulting from the postulated fission product release (during the entire period of its passage) would not receive a total radiation dose to the whole body in excess of 25 rem or a total radiation dose in excess of 300 rem to the thyroid from iodine exposure.
(3) A population center distance of at least one and one-third times the distance from the reactor to the outer boundary of the low population zone. In applying this guide, the boundary of the population center shall be determined upon consideration of population distribution. Political boundaries are not controlling in the application of this guide. Where very large cities are involved, a greater distance may be necessary because of total integrated population dose consideration.
(b) For sites for multiple reactor facilities consideration should be given to the following:
(1) If the reactors are independent to the extent that an accident in one reactor would not initiate an accident in another, the size of the exclusion area, low population zone and population center distance shall be fulfilled with respect to each reactor individually. The envelopes of the plan overlay of the areas so calculated shall then be taken as their respective boundaries.
(2) If the reactors are interconnected to the extent that an accident in one reactor could affect the safety of operation of any other, the size of the exclusion area, low population zone and population center distance shall be based upon the assumption that all interconnected reactors emit their postulated fission product releases simultaneously. This requirement may be reduced in relation to the degree of coupling between reactors, the probability of concomitant accidents and the probability that an individual would not be exposed to the radiation effects from simultaneous releases. The applicant would be expected to justify to the satisfaction of the Commission the basis for such a reduction in the source term.
(3) The applicant is expected to show that the simultaneous operation of multiple reactors at a site will not result in total radioactive effluent releases beyond the allowable limits of applicable regulations.

Code of Federal Regulations

Note: For further guidance in developing the exclusion area, the low population zone, and the population center distance, reference is made to Technical Information Document 14844, dated March 23, 1962, which contains a procedural method and a sample calculation that result in distances roughly reflecting current siting practices of the Commission. The calculations described in Technical Information Document 14844 may be used as a point of departure for consideration of particular site requirements which may result from evaluation of the characteristics of a particular reactor, its purpose and method of operation.

Code of Federal Regulations

[27 FR 3509, Apr. 12, 1962, as amended at 31 FR 4670, Mar. 19, 1966; 38 FR 1273, Jan. 11, 1973; 40 FR 8793, Mar. 3, 1975; 40 FR 26527, June 24, 1975; 53 FR 43422, Oct. 27, 1988; 64 FR 48955, Sept. 9, 1999; 67 FR 67101, Nov. 4, 2002]
(a) The purpose of this part is to establish approval requirements for proposed sites for stationary power and testing reactors subject to part 50 or part 52 of this chapter.
(b) There exists a substantial base of knowledge regarding power reactor siting, design, construction and operation. This base reflects that the primary factors that determine public health and safety are the reactor design, construction and operation.
(c) Siting factors and criteria are important in assuring that radiological doses from normal operation and postulated accidents will be acceptably low, that natural phenomena and potential man-made hazards will be appropriately accounted for in the design of the plant, that site characteristics are such that adequate security measures to protect the plant can be developed, and that physical characteristics unique to the proposed site that could pose a significant impediment to the development of emergency plans are identified.
(d) This approach incorporates the appropriate standards and criteria for approval of stationary power and testing reactor sites. The Commission intends to carry out a traditional defense-in-depth approach with regard to reactor siting to ensure public safety. Siting away from densely populated centers has been and will continue to be an important factor in evaluating applications for site approval.

Code of Federal Regulations

[61 FR 65175, Dec. 11, 1996]
(a) Scope. This part establishes the transfer of proceedings pending with regard to those functions of various agencies which have been consolidated in the Department of Energy and identifies those proceedings which are transferred into the jurisdiction of the Secretary and those which are transferred into the jurisdiction of the Federal Energy Regulatory Commission.
(b) Proceedings transferred to the Secretary. The following proceedings are transferred to the Secretary:
(1) All Notices of Proposed Rulemaking, pending and outstanding, which have been proposed by the Department of Energy and the Department of Energy;
(2) All Notices of Inquiry which have been issued by the Department of Energy;
(3) All Requests for Interpretations which have been filed pursuant to 10 CFR part 205, subpart F, and on which no interpretation has been issued, with the Office of General Counsel of the Department of Energy;
(4) All Applications for Exception Relief which have been filed pursuant to 10 CFR part 205, subpart D, and on which no final decision and order has been issued, with the Office of Exceptions and Appeals of the Department of Energy;
(5) All petitions for special redress, relief or other extraordinary assistance which have been filed pursuant to 10 CFR part 205, subpart R, and on which no order has been issued, with the Office of Private Grievances and Redress of the Department of Energy;
(6) All appeals from Remedial Orders, Exception Decisions and Orders, Interpretations issued by the Office of General Counsel, and other agency orders which have been filed pursuant to 10 CFR part 205, subpart H, and on which no order has been issued prior to October 1, 1977, with the Office of Exceptions and Appeals of the Department of Energy;
(7) All applications for modification or rescission of any DOE order or interpretation which have been filed pursuant to 10 CFR part 205, subpart J, and on which no order has been issued prior to October 1, 1977, with the Office of Exceptions and Appeals of the Federal Energy Administation;

Code of Federal Regulations

Note: For a document relating to procedures for natural gas import and export proceedings see 42 FR 61856, Dec. 7, 1977.
(8) All applications for temporary stays and stays which have been filed pursuant to 10 CFR part 205, subpart I, and on which no order has been issued, with the Office of Exceptions and Appeals of the Department of Energy;
(9) All applications which have been filed with the Office of Regulatory Programs of the Department of Energy and on which no final order has been issued;
(10) All investigations which have been instituted and have not been resolved by the Office of Compliance of the Department of Energy;
(11) All Notices of Probable Violation which have been issued prior to October 1, 1977, by the Office of Compliance of Department of Energy;
(12) All Notices of Proposed Disallowance which have been issued prior to October 1, 1977, by the Office of Compliance of Department of Energy;
(13) All Prohibition Orders which have been issued pursuant to 10 CFR part 303 and as to which no Notice of Effectiveness has been issued;
(14) From the Department of the Interior:
(i) The tentative power rate adjustments for the Central Valley Project, California, proposed on September 12, 1977 ( 42 FR 46619, September 16, 1977).
(15) From the Interstate Commerce Commission:
(i) Ex Parte No. 308 (Sub-No. 1)—Investigation of Common Carrier Pipelines.
(16) From the Federal Power Commission:
(i) Cases:
(A) Northwest Pipeline Corporation, Docket No. CP75-340.
(B) Midwestern Gas Transmission Co., Docket No. CP77-458, et al.
(C) St. Lawrence Gas Company, Docket No. G-17500.
(D) U.S.D.I. Bonneville Power Administration, Docket No. E-9563.
(E) U.S.D.I. Southwestern Power Administration, Docket No. E-7201.
(F) U.S.D.I. Southeastern Power Administration, Docket No. E-6957.
(G) Tenneco InterAmerica, Inc., Docket No. CP77-561.
(ii) Applications:
(A) Maine Public Service Co., Docket No. E-6751. (ERA Docket No. IE-78-1).
(B) Northern States Power Co., Docket No. E-9589, (ERA Docket No. IE-78-2).
(C) Arizona Public Service Co., Docket No. IT-5331. (ERA Docket No. IE-78-3).
(D) Niagara Mohawk Power Corp., Docket No, E-7022. (ERA Docket No. IE-77-6).
(E) Maine Public Service Co., Docket No. IT-6027. (ERA Docket No. PP-12).
(F) Boise Cascade, Docket No. E-7765. (ERA Docket No. PP-52).
(G) Bonneville Power Administration, Docket No. IT-5959. (ERA Docket No. PP-10).
(H) EPR—Oregon (Geothermal Steam Leases).
(I) EPR—Utah (Geothermal Steam Leases).
(J) EPR—Idaho (Geothermal Steam Leases).
(K) EPR—Oregon (Geothermal Steam Leases).
(L) EPR—Idaho (Geothermal Steam Leases).
(iii) Rulemakings:
(A) Implementation of sections 382(b) and 382(c) of the Energy Policy and Conservation Act of 1975. Docket No. RM77-3.
(B) New Form Nos:
151, Docket No. RM76-19.
153, Docket No. RM76-27.
154, Docket No. RM76-33.
156, Docket No. RM76-32.
157, Docket No. RM76-21.
158, Docket No. RM76-31.
159, Docket No. RM76-23.
160, Docket No. RM76-20.
161, Docket No. RM76-26.
162, Docket No. RM76-34.
155, Docket No. RM76-28.
163, Docket No. RM76-30.
164, Docket No. RM76-25.
(C) Procedures for the Filing of Federal Rate Schedules Docket No. RM77-9.
(iv) Project withdrawals and power site revocations:
(A) Project 1021, 1226, 1606, and 1772—(Wyoming)—U.S. Forest Service (Applicant).
(B) Project Nos. 1021, 1226, 1606, and 1772—(Wyoming)—U.S. Forest Service (Applicant).
(C) Project Nos. 220 and 691—(Wyoming)—Cliff Gold Mining Co. (Applicant for P-691) The Colowyo Gold Mining Co. (Applicant for P-220).
(D) Project No. 1203—(Wyoming)—F. D. Foster (Applicant).
(E) Project No. 1241—(Wyoming)—F. B. Hommel (Applicant).
(F) Project No. 847—(Oregon)—H. L. Vorse (Applicant).
(G) Project No. 907—(Colorado)—S. B. Collins (Applicant).
(H) Project No. 941—(Colorado)—Marian Mining Company (Applicant).
(I) Project Nos. 347 and 418—(Colorado)—Jones Brothers (Applicant for P-347) Frank Gay et al. (Applicant for P-418).
(J) Project Nos. 373, 521, 937, 1024, 1415, 1546, 1547, and 1025—()—U.S. Forest (Applicant).
(K) Project No. 163—(Colorado)—James F. Meyser and Edward E. Drach (Applicants).
(L) Project Nos. 385, 445, 506, 519, 1220, 1296, 1418, 1519, 1576, 1615, 1616, 1618, 1678, 1682, and 1750—(Colorado)—U.S. Forest Service (Applicant).
(M) DA-117—(Alaska)—Bureau of Land Management (Applicant).
(N) Project No. 114—(Alaska)—Elizabeth H. Graff et al. (Applicant).
(O) DA-222—(Washington)—Bureau of Land Management (Applicant).
(P) DA-562—(Oregon)—U.S. Geological Survey (Applicant).
(Q) DA-601—(Idaho)—Bureau of Land Management (Applicant).
(R) DA-509—(Colorado)—Fed. Highway Admin. (Applicant).
(S) DA-616—(Idaho)—U.S. Forest Service (Applicant).
(T) DA-1—(South Carolina)—U.S. Forest Service (Applicant).
(U) DA-1116—(California)—U.S. Geological Survey (Applicant).
(V) DA-154—(Arizona)—U.S. Geological Survey (Applicant).
(W) DA-1098—(California)—Merced Irrigation District (Applicant).
(c) Proceedings transferred to the Commission. There are hereby transferred to the jurisdiction of the Federal Energy Regulatory Commission the following proceedings:
(1) From the Interstate Commerce Commission:
(i) Ex Parte No. 308—Valuation of Common Carrier Pipelines.
(ii) I&S 9164—Trans Alaska Pipeline System—Rate Filings (including I&S 9164 (Sub-No. 1), NOR 36611, NOR 36611 (Sub-No. 1), NOR 36611 (Sub-No. 2), NOR 36611 (Sub-No. 3), NOR 36611 (Sub-No. 4)).
(iii) I&S 9089—General Increase, December 1975, Williams Pipeline Company.
(iv) I&S 9128—Anhydrous Ammonia, Gulf Central Pipeline Company.
(v) NOR 35533 (Sub-No. 3)—Petroleum Products, Southwest & Midwest Williams Pipeline.
(vi) NOR 35794—Northville Dock Pipeline Corp. et al.
(vii) NOR 35895—Inexco Oil Company v. Belle Fourche Pipeline Co. et al.
(viii) NOR 36217—Department of Defense v. Interstate Storage & Pipeline Corp.
(ix) NOR 36423—Petroleum Products Southwest to Midwest Points.
(x) NOR 36520—Williams Pipeline Company—Petroleum Products Midwest.
(xi) NOR 36553—Kerr-McGee Refining Corporation v. Texoma Pipeline Co.
(xii) Suspension Docket 67124—Williams Pipe Line Co.—General Increase.
(xiii) Valuation Docket 1423—Williams Pipeline Company (1971-1974 inclusive).
(2) To remain with the Commission until forwarding to the Secretary:
The following proceedings will continue in effect under the jurisdiction of the Commission until the timely filing of all briefs on and opposing exceptions to the initial decision of the presiding Administration Law Judge, at which time the Commission shall forward the record of the proceeding to the Secretary for decision on those matters within his jurisdiction:
(i) El Paso Eastern Co., et al., Docket No. CP 77-330, et al.
(ii) Tenneco Atlantic Pipeline Co., et al., Docket No. CP 77-100, et al.
(iii) Distrigas of Massachusetts Corp., et al., Docket No. CP 70-196, et al.
(iv) Distrigas of Massachusetts Corp., et al., Docket No. CP 77-216, et al.
(v) Eascogas LNG, Inc., et al., Docket No. CP 73-47, et al.
(vi) Pacific Indonesia LNG Co., et al., Docket No. CP74-160, et al., (except as provided in paragraph (c)(3) of this section).
(3) The Amendment to Application of Western LNG Terminal Associates, filed on November 11, 1977, in Pacific Indonesia LNG Co., et al., FPC Docket No. CP74-160, et al., ERA Docket No. 77-001-LNG, is transferred to the jurisdiction of the Commission until timely filing of all briefs on and opposing exceptions to the Initial Decision of the presiding Administrative Law Judge on that Amendment, at which time the Commission shall forward a copy of the record of that proceeding to the Secretary of Energy for decision on those matters within his jurisdiction. (If the Commission waives the preparation of an initial decision, the Commission will forward a copy of the record after completion of the hearing, or after the timely filing of any briefs submitted to the Commission, whichever occurs later.)
(d) Residual clause. All proceedings (other than proceedings described in paragraphs (b) and (c) of this section) pending with regard to any function of the Department of Energy, the Department of Energy, Department of the Interior, the Department of Commerce, the Department of Housing and Urban Development, the Department of Navy, and the Naval Reactor and Military Applications Programs which is transferred to the Department of Energy (DOE) by the DOE Organization Act, will be conducted by the Secretary. All proceedings (other than proceedings described in paragraphs (b) and (c) of this section) before the Federal Power Commission or Interstate Commerce Commission will be conducted by the Federal Energy Regulatory Commission.

Code of Federal Regulations

(Department of Energy Organization Act, Pub. L. 95-91, 91 Stat. 567 ( 42 U.S.C. 7101 et seq.); E.O. 12009, 42 FR 46267)